STANDARD OPERATING PROCEDURE HANDLING OF P&G TECHNICAL STANDARDS
STANDARD
OPERATING PROCEDURE
|
SUBJECT :
HANDLING OF P&G
TECHNICAL STANDARDS
|
DEPARTMENT : QA
SOP
NO. :
Page
No :
Effective
Date :
Next
Review :
SOP
REVISION :
|
1.0 OBJECTIVE:
To lay down the procedure for Handling of
Technical Specifications.
2.0 POLICY:
This Requirement defines the procedure for, receipt,
review, understanding and implementation/ deployment at site the technical
specifications for products manufactured in the site.
3.0 PROCEDURE:
3.1 P&G
site leader will receive Email notification of any new, up-versioned or
archived specification or standard.
3.2 P&G
site leader will hand over the specification or standard to the site QA Head
& this record is maintained as per Annexure-4. When a Contract manufacturer
accepts a Specification or standard, it becomes part of the contract between
P&G and the Contract manufacturer. If any modifications in technical
standards, feedback will be given to the P&G by site.
3.3 The
following documents are shared with the Contract manufacturer by P&G:
Formula Card (FC)
Individual Raw Material Specification
(IRMS)
Individual Packaging Material
Specification (IPMS)
Making Instructions (MI)
Approved Supplier List (ASL)
Master Packing material Specification
(MPMS)
Illustrations (ILST)
Artworks and PSS (Shade card)
3.4 Incase
there is any change in any technical standards, change should reflect in the
corresponding analytical report, COA, and Lab note book etc changed.
3.5 Receipt of Technical Standards, archieving of Technical
Standards and handling of Technical Standards is documented as per Annexure-4.
3.6 The
technical specifications received from the principal company are reviewed and
filed in separate files as per the convenience of the user, and are referred as
& when required. The BMR’s &
PDR’s are photocopied as and when required and are used when the batch
manufacturing and packing is done.
4.0 FREQUENCY:
Whenever the Specifications/documents
are received.
5.0 RESPONSIBILITY:
5.1.1 Provide
CSS approved Technical Standards whenever issued to the site either by hard
copy or through e-mail.
5.1.2 Provide
any necessary training to all contract manufacturers to ensure complete
understanding of technical information as well as format (rows and
columns/structured data) of all specifications & maintain training record if
required.
5.1.3 Ensure
current versions of all specifications are available at site, control the
version of all Technical standards in soft & share as & when required.
5.1.4 Notify
originating function to initiate resolution while notifying HC Standards Office
to keep the previous version active in the system until the rejected
specification has been reworked and accepted by the CM.
5.1.5 Keep
only current version of all Technical documents at site, shred all old version.
5.2 Contract Manufacturer (CM):
5.2.1 Responsible to review specification for completeness and for any
feedback on the technical standards and any revision required.
5.2.2 Responsible
to understand all technical specifications and to provide feedback within 7
business days of receiving. Each CM site has 7 days to implement approved
specifications.
5.2.3 Must be
capable of producing based on issued specifications:
The obsolete technical standards are filed
into a separate record and marked as obsolete.
6.0 REVIEW
GUIDE: Specification files.
7.0 ANNEXURE:
1. RM/FG
Technical Standards Tracking Sheet
2. Packing material Technical Standards
3. Test Methods index (FG/RM/PM /Micro Methods)
4.
For issue & retrieval.
8.0 SOPs
DISTRIBUTION:
This SOP shall be distributed to following
Departments:
|
Name of the Department
|
Master Copy
|
Circulatory Copy
|
|
QA/QC
|
√
|
√
|
|
Production
|
x
|
x
|
|
Warehouse
|
x
|
x
|
|
General
|
x
|
x
|
|
Maintenance
|
x
|
x
|
Comments
Post a Comment