STANDARD OPERATING PROCEDURE (NOT IN USE) LAB EQUIPMENT UV VISIBLE RECORDING SPECTROPHOTOMETER


STANDARD OPERATING PROCEDURE (NOT IN USE)

SUBJECT :                    
LAB EQUIPMENT UV VISIBLE RECORDING SPECTROPHOTOMETER
DEPARTMENT           : QA
SOP NO.                      :
Page No                       :
Effective Date             :
Next Review                :
SOP REVISION           :

1.0       OBJECTIVE:

To provide guidelines for Operation & Maintenance of UV-Visible Spectrophotometer.

2.0       POLICY: 

To establish a procedure for a operation of UV visible recording Spectrophotometer.

3.0       PROCEDURE:

3.1       Remove the silica gel bag from the compartment.

3.2       Switch on the power supply, immediately the screen shows “Initialization” for 1 min., followed by “Base line correction”.

3.3       Then the screen shows “Basic mode”.

3.4       Select the required mode i.e. Photometric/spectrum with the help of key board.

3.5       Then enter the required parameters in the selected mode.

3.6       After entering all the required parameters press “start” key for measurement.

3.7       Before pouring the Blank and Sample solutions in the cuvettes, it should be thoroughly rinsed with respective solutions. Press

3.8       Auto zero before putting Blank and sample cuvettes in the sample compartment.

3.9       After pressing Auto zero put the Blank and Sample cuvettes in respective cells in the compartment.

3.10     Close the compartment and press start key for measurement of the Absorbance of the Sample.

3.11     After measuring absorbance bring the display to mode position and then switch off the instrument.

3.12     After switching off place the silica gel bag in the compartment and close it.

4.0       FREQUENCY:  As and when required.

5.0       RESPONSIBILITY:  Executive Q.A / Jr.Executive.

6.0       REVIEW GUIDE: Calibration register.

7.0       ANNEXURE: -------

8.0       SOPs DISTRIBUTION:

            This SOP shall be distributed to following Departments:

Name of the Department
Master Copy
Circulatory Copy
QA/QC
Production
x
x
Warehouse
x
x
General
x
x
Maintenance
x
x

Comments

Popular posts from this blog

STANDARD OPERATING PROCEDURE CALIBRATION OF SHIMADZU HPLC (LC-2010CHT)

STANDARD OPERATING PROCEDURE Operating and Maintenance Procedure for Cyclo Mixer

STANDARD OPERATING PROCEDURE LAB EQUIPMENT FTIR SPECTROPHOTOMETER – OPERATION AND CALIBRATION