LOCK OUT & TAG OUT PROCEDURES
STANDARD OPERATING PROCEDURE
SUBJECT :
LOCK OUT & TAG OUT
PROCEDURES
|
DEPARTMENT :
SAFETY
SOP NO. :
02/S
Page No :
1 of 2
Effective Date : 05.01.2012
Next Review : 04.01.2014
SOP VERSION : 05
|
1. OBJECTIVE:
To
provide guidelines for precautionary measures to be followed before starting of
maintenance or repairs of machines, equipments and utilities.
2. SCOPE:
To
prevent any accidents or damage of machinery and equipment during maintenance
or repairs.
3. PROCEDURE:
3.1.
The maintenance people should first of all cut off the energy supplies like
power, steam and air to the
equipments.
3.2.
They should keep a lock out / tag out labels on all the control panels of the
equipments as well as
mains and isolators.
3.3.
Release all the stored residual energies after putting the lock out labels.
3.4.
Verify the isolation and lock out by attempting to operate the equipment.
3.5.
Fill in lock out and tag out permit as per the format given in Annexure.
3.6.
After completion of the work remove lock out / tag out labels.
3.7.
Fill in lock out / tag out removal permit as per the format given in Annexure.
4. RESPONSIBILITY :
1) Maintenance Dept.
: 2) Section In charge.
5.
REVIEW GUIDE : As and when required
6. ANNEXURE
: Log
book.
PREPARED BY REVIEWED BY APPROVED BY
PRODUCTION EXECUTIVE PRODUCTION MANAGER
G.M - Q.A
SOP
No. : 02/S
Page : 2 of 2
Version No : 07
7. SOPs DISTRIBUTION:
This SOP shall be distributed to following
Departments:
Name
of the Department
|
Master Copy
|
Circulatory Copy
|
QA/QC
|
√
|
×
|
Production
|
x
|
√
|
Warehouse
|
x
|
√
|
Administration
|
x
|
×
|
Maintenance
|
x
|
×
|
8. VERSION HISTROY:
Revision number
|
Change
|
Revision
no. 03 to 04
|
1. SOP format revised
2.
SOP revised as per due date.
|
Revision
no. 04 to 05
|
1.
SOP revised as per due date.
2.
SOP distribution table included in the SOP
|
Revision
no. 05 to 06
|
|
Version
no. 06 to 07
|
|
PREPARED BY REVIEWED BY APPROVED BY
PRODUCTION EXECUTIVE PRODUCTION MANAGER
G.M - Q.A
Comments