SANITIZATION & OPERATING PROCEDURE FOR PURIFIED WATER PLANT CIRCULATORY LOOP LINE
STANDARD OPERATING PROCEDURE
SUBJECT :
SANITIZATION &
OPERATING PROCEDURE FOR PURIFIED WATER PLANT CIRCULATORY LOOP LINE.
|
DEPARTMENT
: LIQUIDS
SOP NO. : xxx
Page No :
1 of 2
Effective Date :xxxxx
Next Review :xxxxx
Version No :xx
|
1.0 OBJECTIVE:
To
provide guidelines for cleaning, sanitization and operating procedure for
Purified water plant circulatory loop line system.
2.0 POLICY:
To
avoid microbial contamination and to maintain the sanitized condition of
purified water plant circulatory loop line.
3.0 PROCEDURE:
3.1 Collect Purified water in 1000 Ltr tank.
3.2 Shut down RO
plant II.
3.3 Heat water with aid of steam in the 1000 Ltr tank upto
90-940C then start circulation of hot water in the loop line .Then
temperature can be recorded from the display on the calibrated temperature
controller.
3.4 Check the return water temperature display on the
calibrated temperature controller. Return water temperature should reach upto
820C.
3.5 Circulate hot
water at 820C for 30 mins.
3.6 After the completion of 30 minutes sanitization the hot water is drained.
.
4.0 FREQUENCY: Once in 15days.
5.0 RESPONSIBILITY:
Operator / Maintenance executive.
6.0 ANNEXURE: Sanitization process temperature
record.
SOP No. : 12/ ENG
Page : 2 of 2
Version No :xx
7.0 SOPs DISTRIBUTION:
This
SOP shall be distributed to following Departments:
Name
of the Department
|
Master Copy
|
Circulatory Copy
|
QA/QC
|
√
|
x
|
Production
|
x
|
√
|
Warehouse
|
x
|
x
|
General
|
x
|
x
|
Maintenance
|
x
|
x
|
8.0 VERSION
HISTORY:
Version number
|
Change
|
Version no 00
|
NEW SOP
|
Revision
no 00 to 01
|
1. SOP revised before the due date to incorporate distribution
table.
2.
3.C numbered from 1 - 17
|
Version
no 01 to 02
|
1. SOP revised as per due date.
2.
Name of Prime Mover, Concurrer & Approver included in the
SOP.
3. SOP Revision No. included in all
the annexures of SOP.
4.
Annexure subheading and details of annexures included in SOP.
|
Version
no 02 to 03
|
1.This
SOP was 15/L earlier now included as 12/ENG without any change in the
procedure.
|