STANDARD OPERATING PROCEDURE Operation and Calibration Procedure for Compressed Air Sampler




STANDARD OPERATING PROCEDURE

Department: Quality Control
SOP No.: QC/MB/
Operation  and  Calibration  Procedure  for Compressed Air Sampler
Effective Date:
Review Date:
Page No.:



1.0            OBJECTIVE:
1.1                   To lay down a procedure for Operation and Calibration of Compressed Air Sampler.
2.0            SCOPE:
2.1                   This procedure is applicable to Compressed Air Sampler located in microbiology laboratory at Pharma Private Limited.
ID No.
Model No.:
3.0            RESPONSIBILITY:
3.1                   Microbiologist: Responsible for operation of instrument.
3.2                   Section In-charge: Responsible for review the procedure
3.3                   QC Head: Responsible for implementing the Procedure.
3.4                   QA Head: Overall compliance.     
4.0            PROCEDURE:
4.1                 Assembling:
4.1.1             Carry all the parts of compressed air sampler to the sampling area in carrying kit.
4.1.2             Assemble the compressed air sampler as shown in below diagram:
4.1.3             Position the stainless steel base (A) in front of the operator.
4.1.4             Fix the inlet gassing source to (D).
4.1.5             Fix the air flow meter connection (B) in the front to the backside elbow with a triangle SS Plate.
4.1.6             Fix the funnel support (J) on the base.
4.1.7             Insert the “double O-ring” connection (F) into the funnel.
4.1.8             Position the funnel (H) on its support and fix it to the air outlet.
4.1.9             Screw the Contact Plate housing (I) to the funnel head.




                                          Diagram of Compressed Air Sampler
4.2                 Operation:
4.2.1             Connect the compressed air sampling point to the sampling kit through hose pipe.
4.2.2             Now open the line of compressed air slowly.
4.2.3             Open ‘D’ and ‘D2’ valve and adjust the air flow on the flow meter to 100 litres / minute (210 SCFH) to measure sample quantity.
4.2.4             Open the petri plate housing lid of air sampler and fix the media plate into the stainless steel cup holder and screw it to the conical head.
4.2.5             Connect the funnel to the compressed air sampler. Close the D2 valve, open the D1 valve and start the stop-watch to count the sampling time.
4.2.6             Now the sample will be collected on the petriplate.
4.2.7             Close the D1 valve after 10 minutes (1000 litres of air are collected).
4.2.8             Unscrew the head and keep the petri dish in stainless steel carrier.
4.2.9             Collect the air sample from remaining sampling points as per the above procedure.
4.2.10         Before collecting the sample from the next sampling location sanitize the contact plate housing head with 70% IPA.
4.2.11         After completion of sampling from all locations collect all exposed plates in stainless steel petri plate carrier which is previously wiped with 70% IPA and bring to microbiology lab for incubation.
4.2.12         Count the colony forming units in the plate at the end of incubation time and use conversion table given in annexure-I to report the results as cfu/1000 litres of compressed air (cfu/m3).
4.2.13         Record the usage details in usage log sheet (Annexure II).
4.2.14         Note: Plate housing lid of compressed air sampler shall be sterilized in an autoclave at 121°C for 15 minutes.
4.2.15         Precautions:
4.2.16         The lid should be removed only after the plate has been placed into the funnel to avoid undue exposure of the lid and agar filled plate to environmental conditions.
4.2.17         The lid of the contact plate should be placed face down onto a clean, sanitized area or sterile bag when not on the plate.
4.2.18         Follow the gowning procedure as required by the respective department to avoid the additional contamination.
4.3                 Calibration:
4.3.1             The air flow meter of compressed air sampler shall be calibrated by external party once in a year ± one month or after any maintenance work.
5.0            ABBREVIATIONS:

QC: Quality Control
QA: Quality Assurance
SOP: Standard Operating Procedure
IPA:  Isopropyl alcohol.
cfu: Colony Forming Unit
SCFH: Standard Cubic Feet per Hour





Comments

Popular posts from this blog

STANDARD OPERATING PROCEDURE CALIBRATION OF SHIMADZU HPLC (LC-2010CHT)

STANDARD OPERATING PROCEDURE Operating and Maintenance Procedure for Cyclo Mixer

STANDARD OPERATING PROCEDURE LAB EQUIPMENT FTIR SPECTROPHOTOMETER – OPERATION AND CALIBRATION