1.0 OBJECTIVE:
To provide guidelines for Operation & Maintenance
of H PLC System.
2.0 POLICY:
To ensure establish a procedure for operation of
H.P.L.C.
3.0 PROCEDURE:
3.1
Switch on the Power supply and UPS.
3.2
Switch on the Pump, Detector,
computer and Printer, allow to warm the system.
3.3
Check the Column fitted on the
system is suitable or not, if not install the required Column.
3.4
Wash the Column with washing solution
(methanol & water each) for 30 minutes.
3.5
Prepare the Mobile phase and degas
carefully.
3.6
Run the Mobile phase at required
flow rate to saturate the Column and check the baseline.
3.7
Set the required detector parameters
on Detector.
3.8 If the
base line is o.k. Then
set the required chromatogram parameters on Method file or run the injections
on default method first and set suitable parameters.
3.9 Prepare
the standard solutions and run five standard injections on the system and check
system suitability. The injecting sample does not have any air bubbles prior to
injection.
3.10 If the
RSD of the Standards chromatograms is less than two, then the system is
suitable for Sample injections.
Otherwise repeat the Standard injections till you get the RSD below two.
3.11 Inject
the required Sample and take the chromatograms and calculate the Percentage of
Active ingredient on the basis of respective peak areas.
3.12
After completion of work, the Column
must be washed with wash solution for one hour
3.13
For better performance of HPLC system
adhere to the following guidelines:
3.13.1 Use only HPLC grade chemicals.
3.13.2 Mobile phase and all solutions of HPLC must be
filtered and degassed.
3.13.3 Filter the standard and sample solutions using
0.45 micron nylon 66 membrane filter.
3.13.4 Do not operate the system above 3000psi.
4.0 FREQUENCY: As and when
required.
5.0 RESPONSIBILITY:
Executive Q.A.
6.0 REVIEW
GUIDE: Log register &
Calibration register.
7.0 ANNEXURE:
-------
8.0 SOPs
DISTRIBUTION:
This
SOP shall be distributed to following Departments:
Name of the Department
|
Master Copy
|
Circulatory Copy
|
QA/QC
|
√
|
√
|
Production
|
x
|
X
|
Warehouse
|
x
|
X
|
General
|
x
|
X
|
Maintenance
|
x
|
X
|