STANDARD OPERATING PROCEDURE OPERATION AND MAINTENANCE OF G.C (SHIMADZU 14 B)
STANDARD
OPERATING PROCEDURE
SUBJECT :
OPERATION AND MAINTENANCE
OF G.C (SHIMADZU 14 B)
|
DEPARTMENT : QA
SOP
NO. :
Page
No :
Effective
Date :
Next
Review :
SOP
REVISION :
|
1.0 OBJECTIVE:
To provide guidelines for Operation & Maintenance
of G C System.
2.0 POLICY:
To lay down a procedure of Operation and maintenance
of G.C (Shimadzu 14 B)
3.0 PROCEDURE:
3.1
Switch on the Power supply and
switch on stabilizer.
3.2 Switch
on the instrument, heater, press FID button and Integrator, allow to warm the
system for few minutes.
3.3 Open
the gas cylinders Helium, Air and Hydrogen by turning the opener key to the
left slowly and gently.
3.4
Open the Toggle switch by lifting up
Helium gas.
3.5 Feed
the required temperatures to the instrument as per the method requirement
Column Initial Temp, Injector and Detector Temperatures. Start the instrument
3.6 Once
the temperatures are attained heating indicators will blink and Ready Lamp will
glow.
3.7 Open the Air and Hydrogen
toggle switches by lifting them. Adjust the pressure of Air and Hydrogen 50:60
ratio. Press the knob near the Air pressure dial and start igniting the
detector with Continuous sparks gas lighter.
Check that the ignition has taken place by placing metallic piece just
above the FID and see condensation.
3.8
Feed the required parameters to the
integrator by pressing PARA and Enter.
3.9
Check for baseline. If the baseline is ok start analysis by injecting
required Quantity with microlitre
syringe.
3.10 If the
RSD of the three Standards chromatograms ratio is less than 2%, then the system
is suitable for Sample injections. Otherwise repeat the Standard injections till
you get the RSD below 2%.
3.11 Inject
the required Sample and take the chromatograms and calculate the Percentage of
Active ingredient on the basis of respective peak ratios.
3.12 After
completion of work, cool the instrument by calling cooling method File 4 and
enter. Once the instrument is cool stop the gases and shutdown the power.
3.13
For better performance of GC system
adhere to the following guidelines:
3.13.1 Use only required temperature as per the
method.
3.13.2 Cool the instrument before shutting the power.
3.13.3 Close the gases, Check that all dials on the
instrument come to Zero.
3.13.4
Do not open the
chamber door during the working of the instrument.
3.14 Handle the injection syringe carefully. Do
not pull the plunger out. Preserve carefully after use.
4.0 FREQUENCY: As and when
required.
5.0 RESPONSIBILITY:
Executive Q. A.
6.0 REVIEW
GUIDE: Log register.
7.0 ANNEXURE:
-------
8.0 SOPs
DISTRIBUTION:
This
SOP shall be distributed to following Departments:
Name of the Department
|
Master Copy
|
Circulatory Copy
|
QA/QC
|
√
|
√
|
Production
|
x
|
x
|
Warehouse
|
x
|
x
|
General
|
x
|
x
|
Maintenance
|
x
|
x
|
Comments
Post a Comment